BACO Risk Assessment

We regret it is not possible to save and return to this form later.

A COPY OF YOUR COMPLETED FORM WILL BE SENT  TO YOU BY THE SECRETARIAT.

A blank form submitted or one with the blanket wording ‘no risks’ throughout will not be accepted as an adequate and accurate assessment. We ask for nothing complicated, just some common-sense listing of obvious things such as trip hazard from boxes, loose cabling, secure panel and display erection etc.

A template guide is available to download at the bottom of this page.

Risk Assessment

1

To calculate the risk level, use the formula: Probability (1-5) X Severity (1-5) = Risk (Between 1 - 25), P X S = R
Once the controls have been considered and recorded, re-calculate the Risk Level (PxS=R) and determine the Action Level where: High: 8+ = immediate action required Medium: 5-7 = justify and review each event day Low: 1-4 = no further action required

2

To calculate the risk level, use the formula: Probability (1-5) X Severity (1-5) = Risk (Between 1 - 25), P X S = R
Once the controls have been considered and recorded, re-calculate the Risk Level (PxS=R) and determine the Action Level where: High: 8+ = immediate action required Medium: 5-7 = justify and review each event day Low: 1-4 = no further action required

3

To calculate the risk level, use the formula: Probability (1-5) X Severity (1-5) = Risk (Between 1 - 25), P X S = R
Once the controls have been considered and recorded, re-calculate the Risk Level (PxS=R) and determine the Action Level where: High: 8+ = immediate action required Medium: 5-7 = justify and review each event day Low: 1-4 = no further action required

SPACE ONLY